georgedixon21 georgedixon21
  • 19-04-2018
  • Mathematics
contestada

a machine takes 4.2 hours to make 7 parts . At that rate how many parts can the machine make in 28.8 hours.

Respuesta :

angelgarciapd1 angelgarciapd1
  • 19-04-2018
17.28 because 4.2 divided by 7 is .6 then .6 times 28.8 is 17.28
Answer Link

Otras preguntas

What type of transport is illustrated in the diagram and what type of molecule would be transported using this process? A. Passive transport; carbohydrates B. A
do we need nuclear energy to stop climate change?
Two resistors, R 1 and R 2 , are connected in parallel. R 1 =35.0 ohms, and the equivalent resistance of the combination is 14.5 ohms. What is the value of R 2
please help me pleaseeee
Which equation can be used to solve for x in the following diagram? 72° 112° PLEASE HELP LOL
i don't like school that's why I'm here
which polygon matches this set of ordered pairs? A (1,3),B(1,9),c(4,9),d(4,3)
1. Identify these words as synonyms, antonyms, or homophones. | here / hear A. homophones B. antonyms C. synonyms
m*n= [tex]\sqrt{x} mn-n2, then 5 *3\\[/tex]
Point A and point B are places on a number line. Point A is located at -20 and point B is 5 less than point A. Which statement about point B is true?