SpiritedAway6769 SpiritedAway6769
  • 19-03-2018
  • Business
contestada

Activity-based costing allocates overhead to multiple cost pools and assigns the cost pools to products using cost drivers.
a. True
b. False

Respuesta :

kmead1800
kmead1800 kmead1800
  • 19-03-2018
activity based costing allocates overhead to multiple cost pools is A TRUE
Answer Link

Otras preguntas

The coordinates of the vertices of ANGLE PQR are P(-3,3), Q(2,3), and R(-3,-4). Find the side lengths to the nearest hundredth and the angle measures to the nea
How is correct : "cus" or "cuz" ?
How is correct : "cus" or "cuz" ?
The coordinates of the vertices of ANGLE RST are R(-3,5), and S(4,5), and T(4,-2). Find the side lengths to the nearest hundredth and the angle measures to the
How many parrallel lines does a triangle,square,trapezoid,pentagon
How many parrallel lines does a triangle,square,trapezoid,pentagon
How to make money quickly
a store mixes red fescue worth $12 per pound and chewings fescue worth $16 per pound. The mixture is to sell for $15 per pound. Find out how much of each should
How I say I want to go home in French?
The coordinates of the vertices of ANGLE RST are R(-3,5), and S(4,5), and T(4,-2). Find the side lengths to the nearest hundredth and the angle measures to the