156377863 156377863
  • 18-02-2022
  • History
contestada

why was the armistice of compiegne signed after only 3 days of negotiation

Respuesta :

Аноним Аноним
  • 18-02-2022

Answer:

The Germans were handed the list of Allied demands and given 72 hours to agree.

Explanation:

Answer Link

Otras preguntas

The diagram is an example of
A homeowner estimates that it will take 11 days to roof his house. A professional roofer estimates that he could roof the house in 6 days. How long will it take
Help me I need to pass this
The equations of four lines are given. Identify which lines are perpendicular. Line 1: y=2 Line 2: y=15x−3 Line 3: x=−4 Line 4: y+1=−5(x+2)
Doug & Jennifer are a 40-something married couple. They have built up an emergency fund of $10,000 that they would like to invest in order to benefit from c
The angle of elevation from a point on the ground to the top of a tower is 18°. The base of the tower is 100 feet from the point on the ground. Find the height
different between desktop application and web application ?​
If it takes sally 45 minutes to walk 1 mile how long will it take sally to walk 1,954 miles?
Which of the lines below has a negative slope?
pls help don’t what the answer is