homeworkliza
homeworkliza homeworkliza
  • 18-01-2021
  • Mathematics
contestada

5 workers can repair the road in 9 hours. How long will it take 3
workers to do the same repairs? hours
Need just the answr please

Respuesta :

bexwhite2610
bexwhite2610 bexwhite2610
  • 18-01-2021

Answer:

need to work out how long it would take 1 person first.

9 X 5 = 45

1 person will take 45 hours

45/3= 15 hours

Answer Link

Otras preguntas

Which organism is the secondary consumer in this food chain? Aspen - Rabbit -> Snake – Hawk A. Rabbit B. Aspen C. Hawk D. Snake
Does that look right or am I supposed to multiply and get 52.7
The area of a kite is 51.68 square inches. One diagonal measures 15.2 inches. What is the measure of the other diagonal?
Consider the test of Upper H 0​: The defendant is not guilty against Upper H Subscript a​: The defendant is guilty. a. Explain in context the conclusion of the
What is the equation for the blue line?
According to Mussolini, what is the main role of the individual? to serve the state to lead the state to oppose nationalism to create propaganda
Is the Phosphorus element a metal?
This marine mammal uses sea ice to hurt for other marine mammals It’s a scavenger hunt plssss
what is 3-4x+2=13 will give brainliest!
The graph below shows the height of a projectile t seconds after it is launched. If acceleration due to gravity is –16 ft/s2, which equation models the height o