Profit, time and performance are all basic classifications of project priorities.
a) true
b) false

Respuesta :

jepessoa
jepessoa jepessoa
  • 18-08-2020

Answer:

b) false

Explanation:

The basic classifications of project priorities are cost, time and performance. Profit is not included in the list, cost is included.

A project manager must decide how to manage the trade offs between cost, time and performance. E.g. if you want something well done and cheap, you cannot expect to have it done fast. If you want something done well and fast, it wouldn't be cheap.

Answer Link

Otras preguntas

What does Odysseus's failure to wake up and prevent his men from slaughtering the sun god's cattle signify? A.Eurylochus's skills as a leader B.the power of the
Explain why !!? Please answer!?
Solve. 8 - 2d = c 4c + 3d = 2 c = ??? d = ???
The high surface tension of water explains why water _____. dissolves ionic compounds, such as sodium chloride dissolves molecular compounds, such as glucose fo
HELP ASAP!!!! what would best fit in theblank?? dan is a great coach ___ he motivates the girls in a positive way.
Which compound is a conjugate acid-base pair? H2PO4– and HPO42– H3PO4 and HPO42– H2PO4– and PO43– H3PO4 and PO43–
What is the difference between a habitat and a niche give an example of each?
If a cup of coffee is at 90°C and a person with a body temperature of 36°C touches it, how will heat flow between them? from the hand to the cup from the cup t
I need help ASAP!!! Please help me with this!!!
What are the three common fossil fuels?