kaileyleonard0867 kaileyleonard0867
  • 18-05-2020
  • Mathematics
contestada

A mill processes 48 tons of flour in 3 hours. How many tons of flour can the mill process in 8 hours if its rate or production stays the same?

Respuesta :

benyisraela
benyisraela benyisraela
  • 18-05-2020

Answer:

128 tons can be processed in 8 hours.

Step-by-step explanation:

48 divided by 3 = 16 (to see how much tons are produced in 1 hr.)

16 x 8

  =128

Answer Link
jyothsnakrishn85
jyothsnakrishn85 jyothsnakrishn85
  • 20-05-2020

Answer:

128 tons in 8 hours

Step-by-step explanation:

do 48 divided by 3 = 16      

to see how much tons get produced in an hr.

then when you do 16x8 which is 128

Answer Link

Otras preguntas

In a six-sided dice game, a prize is won if the arithmetic mean of number rolled is 3.25-3.75. In a second game, a prize is won if the arithmetic mean is more t
What is Zero Times Infinity? Please Explain.
The spleen works as a recycling plant; the other organ with a similar function is the
The allied invasion of ________________ in november 1942 had shown that a large scale invasion from the sea was possible
Define freedom in your own words. Must be one paragraph (5-7 sentences)
​________ refers to the legal term for a brand​ name, brand​ mark, or trade character.
The heads of departments are appointed by the president and approved by a __________.
What does d=1/2gt^2 solve? if g=gravity and t=halftime The distance from the ground to the peak, or the peak to the ground? (I am using this for my assignment a
Is this correct for the last awnser 15 that you Cant see the awnser i put right triangle triangle i so celos
4/7x = 64 Answer for x