krmattox23 krmattox23
  • 16-05-2020
  • Engineering
contestada

How much work is performed if a 400 lb weight is lifted 10 ft ?

40 lb/ft

0.025 ft/lb

4000 ft·lb

4000 ft/lb

Respuesta :

Аноним Аноним
  • 16-05-2020

W = M*G*H

Work done = 400*10

w = 4000 ft.lb

hope it helps!

Answer Link

Otras preguntas

A coding supervisor must determine the number of FTEs needed to code 600 discharges per week. If it takes an average of 20 minutes to code each record and each
The property of water in which it attaches to another surface is known as: *
Put the following into correct SciNot: 0.0058 x 10^15.1 point​
b. Suppose the government sets a target price of $5 per bushel for any quantity supplied up to 1,000 bushels. How many bushels of corn are purchased by consumer
A value meal package at Ron's Subs consists of a drink, a sandwich, and a bag of chips. There are 5 types of drinks to choose from, 6 types of sandwiches, and 4
A=2 b=3 c=4 1) ab - c = 2) 6c - 2b= 3) a + b - c + 5 = 4) 7c - 2a =
Consider a uniform distribution from aequals4 to bequals29. ​(a) Find the probability that x lies between 7 and 27. ​(b) Find the probability that x lies betwee
The Tangier Company is considering eliminating the following product line: Product AXP Sales $ 44,000 Less variable costs: Raw materials 27,000 Direct labor 6,6
The following probabilistic activity time estimates are for the CPM/PERT network in Problem 9.9: TIME ESTIMATES (DAYS) TIME ESTIMATES (DAYS) ACTIVITY a m b ACTI
Who won the super bow 49