contestada

4) How much concrete was required to make the Hoover
Dam? Where did this concrete come from?

Respuesta :

Аноним Аноним
  • 02-11-2020

Answer:

Three and one-quarter million cubic yards.The initial concrete required for the dam was mixed in a river-level mixing plant which was located approximately 3/4 of a mile upriver from the dam site This plant provided the concrete for the linings in the diversion tunnels and for the lower levels of the dam. It went into operation on March 3, 1932.

Explanation:

Answer Link

Otras preguntas

The true price of a gift you purchased by mail order is $18.52, but you were billed for $19.17. Find the absolute and relative errors.
List the category, origin, possible uses and characteristics of haloumi cheese.
What is it referred to when we tend to remember the first and last thing we are introduced to?
Reading through the Introduction and Procedure, why is it important that we carefully remove all of the precipitated solid before we add the drops of concentrat
solve 6t^2-42t+72=0 using the quadratic formula
Ways of achieving political stability
Let Y denote a binomial random variable with n trials and probability of success p. Find the probability-generating function for Y and use it to find E(Y) and V
y=-x-2, 3x+3y=6 can you solve using substitution ​
Name a specific employer who hires people in this career: Accountant.
The following questions refer to an experiment in which a dialysis-tubing bag is filled with a mixture of 3% starch and 3% glucose and placed in a beaker of dis