If 7 workers take 500 hours to finish a project, how long will it take 14 workers to complete the same project​

Respuesta :

AyaanR
AyaanR AyaanR
  • 17-02-2020
250 hours because double the people = half the work
Answer Link

Otras preguntas

write a python program that prompts users for the width and height of the box. then, display the box. the following symbols are used to denote different parts o
In the copolymerization of vinyl chloride and vinyl acetate, what monomer feed composition is needed to produce a copolymer containing 5 mol% vinyl acetate? Not
Who is the antogonist in Thank you, Ma'am, and why?
Please list 7 mono-substituted benzene derivatives along with their root names. For example, toluene is the root name of methylbenzene. This should not be inclu
Excerpt from your question for author here
What is a comparison of best practice methods called? 1) Fishboning 2) Brainstorming 3) Baseline Measurements 4) Benchmarking 5) Check Sheets
The nurse is analyzing assessment data in the care of a 78-year-old female in rehabilitation after hip surgery. For each assessment finding, click to indicate w
Colonial support for the ideas outlined in the Declaration of Independence increased during the 18th century as a result of
When are children more likely to be left unattended? 1) In the classroom 2) During transitions 3) Naptime 4) Circle time
Help? Describe the key features of the function - f(x)=(5)^x Select one: x-intercept: 5 y-intercept: None Vertical asymptote at the y-axis x-intercept: Non