linusjyron2175 linusjyron2175
  • 19-12-2019
  • Social Studies
contestada

Which one of the following is not a primary component of an internal control system?A. Risk assessmentB. Information and communicationC. MonitoringD. Rationalization

Respuesta :

dannwaeze45 dannwaeze45
  • 21-12-2019

Answer:

D

Explanation:

The internal control structure of a company is made up of the policies and procedures established to provide reasonable assurance that particular objectives will be achieved.

The system or structure consists of the following:

  1. Controlling the environment
  2. Risk assessment
  3. Control activities
  4. Information and communication
  5. Monitoring

Rationalization is not one of them.

Answer Link

Otras preguntas

Evaluate 4 - 2f when f = 1.
What does Baan find fascinating about all of the places he shares?
Approximately how many Jewish people were killed during the Holocaust?
Solve for c7c + 3 - 7c = 3c - 9​
The number of passengers on coaches travelling along 12 popular scenic routes are 29 42 45 39 36 41 38,37.43,35 and 40 find the mean numbres of passengers on co
Using the verb ir and the vocabulary seem in the online lesson, say to what places do the following people go according to their hobbies and preferences. Rememb
Gloria and Maria are out for a walk on a rainy day. They come to the edge of a large circular puddle that has a radius od 4 feet. Gloria is wearing galoshes, so
A hammer strikes one end of a thick iron rail of length 5.60 m. A microphone located at the opposite end of the rail detects two pulses of sound, one that trave
What is a possible number less than 3?
Find LCM (22, 26, 351).