chngkyn1
chngkyn1 chngkyn1
  • 20-12-2018
  • Mathematics
contestada

The graphic shows the schedule network diagram (in minutes) for assembling a toy train set. What is the duration of the critical path?

A) 38 minutes
B) 41 minutes
C) 49 minutes
D) 51 minutes

The graphic shows the schedule network diagram in minutes for assembling a toy train set What is the duration of the critical path A 38 minutes B 41 minutes C 4 class=

Respuesta :

chocolateandchildren chocolateandchildren
  • 26-12-2018
D because it is longer than the rest
Answer Link

Otras preguntas

Plz help it is a probability question it is soo hard - I have tried and tried
Please give me as many words as you can that rhyme with Hearts. It's for a poem at school.
The density of gold is 19.3g/cm3. The density or iron pyrite is 5.0g/cm3. If a nugget of iron pyrite and a nugget of gold each have a mass of 50g, what can you
What does advancement via individual determination mean ?
what type of mammal is a peccary is it a marsupial, monotreme or a placental
An earthquake takes place in which sphere?
The density of gold is 19.3g/cm3. The density or iron pyrite is 5.0g/cm3. If a nugget of iron pyrite and a nugget of gold each have a mass of 50g, what can you
How does force change when it is applied to the axle of a wheel and axle?
Please help? Simplify:
Find the density of an unknown liquid in a beaker. The empty beaker's mass is 165 grams. With the unknown liquid inside the beaker, the total mass is 309 grams