kevooo20 kevooo20
  • 18-10-2018
  • English
contestada

What body of water was formed as a result of the building of the glen canyon dam ?

Respuesta :

balvarezklein balvarezklein
  • 18-10-2018

When the Glen Canyon dam was finished in the year 1963, its waters, which were averted from the Colorado River, began to fil the body of water that is known as Lake Powell. This artificial lake was named after John Wesley Powell, who explored the Corolardo river at the time of the American Civil War. Lake Powell first attained the level of 3 700 feet in the year 1980, having taken eleven years to fill.

Answer Link

Otras preguntas

does a baby need a passport to travel domestically
Which of the following r-values represents the strongest correlation? A. 0.25 B. 0.35 C. 0.55 D. 0.45
Question Graph the inequality on the number line. g>2.75
Graph: y+2=-3/4(x+4)
b. Match the following: 1. Ladakh 2. Monastery 3. Oasis 4. Mongoose 5. Lamas,---a)Depressions with water and plants,b)Animal of Sahara desertc)Cold desert d)Hem
Find the new price after the discount is applied. Round to the nearest cent if necessary. $13.50 discounted 75%
How many questions should we answer to activate messages on brainly?
Estimate the value of 97.5 divided by 1.96.​
A group of 16 people is choosing a chairperson and vice-chairperson. They put all 16 people's names into a hat. The first name drawn becomes chair. The second n
A car moves with an average speed of 45 miles/hour. How long does the car take to travel 90 miles? OA. 2 minutes OB. 2 hours OC. 45 minutes OD. 45 hours OE. 90