deepasatwal200p8txnx deepasatwal200p8txnx
  • 16-05-2018
  • Mathematics
contestada

2 men and 5 women can do a piece of work in 4 days, while one man and one woman can finish it in 12 days. How long would it take for 1 man to do the work?

Respuesta :

Аноним Аноним
  • 16-05-2018
the answer is 12 days!
hope this helps!
Answer Link

Otras preguntas

How do us measure volume in science e.g if something is 14ml What is that in cm3 thanks
Consider the following system of equations. Y=3x-7 Y-3x=5 What can you conclude about the system of equations? The system if equations is inconsistent. The syst
what does 'don't judge a book by the cover' mean?
Compare and contrast the settling of Jamestown to that of the colonies in Massachusetts
what is the structure of a protein?
what is a 'diamond in the rough'?
List all factor for each number 100. 65. 70
what is the wise fool?
After Pennsylvania experienced its oil boom in 1859, three other states discovered vast oil reserves. Name two of these states.
What kind of organic compound is oxybenzone?