lalashay3444 lalashay3444
  • 19-02-2024
  • Business
contestada

Which of the following methodologies is appropriate for planning and controlling activities and resources in a system project?
A. Gantt charts
B. Program evaluation review technique (PERT)
C. Critical path methodology (CPM)
D. Function point analysis (FP)

Respuesta :

Otras preguntas

Sandstone and Slate is used for building, but these rocks have different Properties. Which rock woul you use for roof? Which would you use for the walls of a bu
What is 6 more than the difference of b and 5 as an algebraic expression
what is the square root of 364
what is 3,298,076 in word form
who were the first settlers of Rome?
please help :) Jared is playing a game on a grid that is made up of 25 equally sized squares. Some of the squares are shaded. If the probability of picking a po
Four friends played mini golf. Their scores were –3, –2, –1, and 2. What is the mean absolute deviation of their scores?
Which products are negative? Choose all answers that are correct. A. 8*(-1.1)*5 B. (-1 and one fourth) * (negative 2 and three fourth)* negative 3. C. ( –3.1)
How does temperature affect the speed of sound in the air
which is required by all living things