Nodes not on the critical path contain ________ time and allow the project manager some flexibility in scheduling.
A. Shortest
B. Critical
C. Slack
D. Report

Respuesta :

Otras preguntas

Solve for x 2x^2/3=dg
A roller coaster car rapidly picks up speed as it rolls down a hlope. As it starts down the slope, its speed is 4 m/s. But 3 seconds later, at the bottom of
Plz can someone help I have tried this question so many times. Thanks
The atmosphere contains about 80% nitrogen gas, but nitrogen in this form cannot be used by plants. Which process converts atmospheric nitrogen to a useful
If a solution has a pH of 7.41, determine its H+ concentration.
How does force change when it is applied to the axle of a wheel and axle?
which types of laws does judasim uphold?
15cm3 block of gold weighs  2.8N it is carefully submerged in a tank of mercury. one cm3 of mercury weight 0.!3n a will the mercury be displaced by the gold?
Please help? Simplify:
Which statement is always true for a square, but not always true for a rhombus? - Two angles are obtuse. - All sides are equal. - Two or more angles are ri