deyaphillips112 deyaphillips112
  • 18-01-2024
  • Engineering
contestada

After girders or beams are set in place, the first step in building the floor frame is to?
a. Install floor joists
b. Lay the subflooring
c. Install the floor insulation
d. Place the concrete foundation

Respuesta :

Otras preguntas

Read the following sentences from the first paragraph of a newspaper article and answer the questions that follow. The news is out! Lee Forest announced Tuesda
18 tens 20 ones= blank hundreds
What country was concerned with exploring in the sixteenth century, due to a civil war?
Latosha was using an electric saw and got her fingertip too close to the blade. She severed the tip and the finger bled heavily. Besides stopping the bleeding,
What is the Square root of 64
One of the most frequent precipitating events leading to youth suicide is a severe argument with parents
Please help! Which of the following is an irrational number? A- (-22) B- 7.832.... C- 3/8 D- 8.5 Thanks in advance!
What is the equation of the following line? (0,0) (6,2)
need help with this I don't understand this please tell me the answer
John answered 23 out of 25 questions correct on his quiz. what percent of the questions did he get correct?