tupacbestmc6435 tupacbestmc6435
  • 20-05-2023
  • Business
contestada

mcphee company manufactures rugs in the cutting and assembly process. rugs are manufactured in 70-rug batch sizes. the cutting time is 13 minutes per rug. the assembly time is 25 minutes per rug. it takes 17 minutes to move a batch of rugs from cutting to assembly. what is the value-added lead time??

Respuesta :

Otras preguntas

what is 20% of 41,844,000?
One of the reasons given for the colonization of Georgia was to serve as a "buffer" colony. This meant that Georgia was a. an outpost from which English pirate
What is 17 divided by 4 in a fraction
The two factors that cause technology to progress
643=4 x 160+n in 5 grade math
Draw an area model. Then, solve using the standard algorithm. 27x36
Write a subtraction sentence using integers. Then write the equivalent addition sentence and explain how to find the sum.
Complete the sentence with the correct form of the verb gustar and the indirect object pronoun (me, te, le, etc). A mí __________ __________ estudiar mucho en
what kind of data would you need to collect to carry out this experiment?
A diver went 25.65 feet below the surface of the ocean and then 16.5 feet further down he then rose 12.45 feet write and solve an expression to find the