zakkski24401 zakkski24401
  • 18-11-2022
  • Business
contestada

consider the task network illustrated below, with the estimated effort shown in units of person-months. make the appropriate assumptions to convert it into a project schedule. a. explain what assumptions you need to make. b. use these assumptions and convert the task chart to a schedule bar chart.

Respuesta :

Otras preguntas

What led to the downfall of the Ghana, Mali and Songhai empires??
Help me, please, i"m desperate
What limits cell division?
Which describes the major cause of the French and Indian War? A. disagreements between the French and the Indians over how to use the land and who owns the land
War between Austria and Prussia over two smaller German states?
Jack is 1.75 m tall and casts a shadow 2.25 m long. At the same time, a statue casts a shadow 9 m long. What is the height of the statue? a. 4 m b. 7 m c.5.75 m
What is 1/5 of 10? Fracation work
what group invaded ghana in the late 1000s
In a pure market economy, the government controls most actions.
A vegetable garden with an area of 200 square feet is to be fertilized. If the length of the garden is 1 foot less than three times the width, find the dimensio